Mobile cranes: load-radius charts, gross lifting loads and supported setup
Mobile cranes should be selected from the actual load radius, height, configuration and site requirements, using the chart and notes for the proposed lift. A maximum-capacity label does not establish the capacity at another radius or on another support arrangement. Broderson’s RT-300-C technical sheet identifies 30,000 lb at a 10 ft radius and separately states that its capacity headline is on outriggers. Keep those conditions rather than assigning 30,000 lb to every position or on-tire operation. For an expressly assumed chart requiring gross-load comparison, a 10,000 lb object, 800 lb hook block and 200 lb of lifting accessories total 11,000 lb; count them according to the actual chart’s inclusion rules. Confirm the supported boom, jib, counterweight and lifting direction, then establish ground, clearance, travel and transport arrangements. Neither wheels, a carrier category nor a product’s pick-and-carry description supplies unrestricted load-travel permission.
Mobile cranes need the actual load position and chart configuration
What information should lead a mobile-crane selection?
Establish the load and lifting equipment, pick and placement positions, radius and height, clearances and site access. Select a supported configuration and chart at those positions. A machine that reaches the required height may still lack capacity at the required radius, while the largest catalog capacity cannot resolve ground support or a restricted setup area.
What conditions belong to the RT-300-C capacity headline?
The Broderson RT-300-C technical sheet identifies 30,000 lb at a 10 ft radius and labels the capacity headline on outriggers. Retain the 10 ft radius and outrigger condition. The number is not an allowance at every radius, on tires or with another boom arrangement, even though the same crane is physically capable of moving or reaching those positions.
Can maximum capacity, boom length and tip height be combined?
Check which operating point each limit describes. Read geometry and capacity together.
Maximum capacity, boom length and tip height may describe different configurations. The number of boom sections also does not establish a universal reach, stiffness or capacity ranking between different designs; the actual permitted extension and load information are needed.
Read inclusions before calculating the suspended demand
| Item | Assumed mass |
|---|---|
| Object | 10,000 lb |
| Hook block | 800 lb |
| Lifting accessories | 200 lb |
| Calculated total | 11,000 lb |
What belongs in a gross suspended-load comparison?
Follow the chart’s definitions and inclusion rules for the object, hook block, rigging, attachments and other required items. With expressly assumed masses of 10,000 lb for the object, 800 lb for the block and 200 lb for accessories, the total is 11,000 lb. Use actual equipment weights for a planned lift.
Should a hook block be deducted when already included?
Read what the applicable chart and rating already include before adding or deducting equipment. Double-counting an included item misstates the result, while omitting a required item overstates the remaining allowance.
Record each mass, lifting-point definition and chart note. A generic percentage cannot establish net capacity.
Identify the permitted carrier and support arrangement
Does every mobile crane use outriggers for every rated duty?
Establish the actual outrigger, on-tire or other permitted setup and the corresponding chart. Match each duty to its supported setup. Do not apply an outrigger chart to a traveling operation or assume a short-radius cell provides the headline maximum under every boom, direction and support condition.
How do carrier categories help narrow a selection?
Truck-mounted, rough-terrain, all-terrain and industrial or carry-deck arrangements can serve different access and working needs. Check road approvals and actual transport configuration. A category label helps identify candidate equipment but cannot certify travel across weak ground, use on every road or a particular load-handling operation.
Does lifting capacity determine how a crane travels to the site?
Use the actual road or transport configuration, dimensions, axle loads and route requirements. Some moves need configuration changes, separate equipment or permits, while others use a different supported arrangement. A universal claim that every large crane travels with boom sections removed or that road speed follows from lifting capacity ignores the offered machine and planned route.
Assess ground, load travel and the setup envelope
What establishes adequate ground support for covered US construction work?
OSHA 1926.1402 addresses support and level conditions that meet the manufacturer’s requirements for covered crane operations. Check reactions and ground support separately.
Assess reactions, support materials and ground layers. A deployed stance or visible mat footprint cannot prove adequate support.
May any wheeled crane travel with a suspended load?
OSHA 1926.1417 retains manufacturer prohibitions and conditions for covered load travel, including competent supervision of permitted travel. Use the actual configuration, rating, boom and load position and controlled route. Wheels or a pick-and-carry description do not authorize every load movement, and a stationary chart cannot simply be transferred to a traveling duty.
What should be checked about the available setup space?
Plot the crane, boom movement, counterweight envelope, support equipment, loads and required clearances against the site. Include site access and nearby traffic interactions. A maximum reach figure or compact carrier width does not establish that the machine can be positioned and operated without conflicts, or that the ground beneath every support can carry its reaction.
Specify the complete lift package in competing offers
What makes mobile-crane offers comparable?
Request the same load positions, lifting equipment, chart configuration, ground and support scope, transport arrangement and operating responsibilities. Separate chart capacity from assumed timing and costs.
Compare crawler cranes, telehandlers and crane setup, ground and outriggers. Browse machine classes.
Choose the carrier from access and the supported lift
A truck-mounted, rough-terrain, all-terrain or industrial carry-deck arrangement can narrow the shortlist, but establish the actual access, travel and setup requirements before selecting one. Road mobility, steering modes, clearances and transport configuration belong to the particular crane. Carrier category cannot establish permission for every road move or capability on unknown ground.
Identify the boom arrangement and any jib or other attachment with the required configuration. Telescopic sections and lattice equipment have their own approved deployment combinations. More sections or a higher tip cannot establish a universal stiffness, play or capacity ranking.
Read the chart and its notes at the required load position rather than combining separate catalog maxima.
Plan support and lifting responsibilities before arrival
Obtain the support reactions for the proposed configuration and assess the underlying ground and known underground conditions. Include the required mat or supporting arrangement and its load-transfer properties. Outrigger spread alone cannot establish bearing pressure, and visible hardstanding does not prove the strength of every underlying layer.
Plot power-line and other overhead hazards, counterweight sweep, load path and adjacent traffic with the applicable clearances and controls. Confirm who provides the setup assessment, operating and signaling roles and required qualification evidence. Apply the rules for the actual work; a general mobile-crane description is not a complete jurisdiction or operator-licensing determination.
Keep inspection and maintenance records with the crane identity and configuration. Record rope, boom, mechanisms, control and running-gear findings and the required repairs under the relevant inspection procedure. A successful pick does not independently verify every structural and lifting component or the documented operating limits.
Separate the lift from mobilisation and load travel
For arrival, establish secured dimensions, mass, axle loads and any separately carried components. Obtain the relevant route permissions and assembly or preparation scope. Do not promise that all large cranes remove the same counterweights or boom sections, or that a carrier's speed makes the route legal.
For proposed suspended-load travel, use the manufacturer's supported configuration and procedure and the applicable work requirements. Keep load position, route, ground and supervision with that plan. A stationary chart and a pick-and-carry product description cannot supply unrestricted permission for a different travel arrangement.
Mobile-crane specification groups
Find the actual model and installed arrangement in the linked section. A comparison group can include different carriers or generations; read each source and configuration before selecting the operating documentation.
Kobelco: mobile-crane references
Liebherr: mobile-crane references
- Liebherr LTM1025 to LTM1120 specifications
- Liebherr LTM1090, LTM1120/1, and LTM1160 specifications
- Liebherr LTM1100-5.2 to LTM11200-9.1 specifications
- Liebherr LTM1160-5.1, LTM1200-5.1, and LTM1220-5.2 specifications
- Liebherr LTM1160/2 specifications
- Liebherr LTM1300-6.1 and LTM1400-7.1 specifications
- Liebherr LTM1500-8.1 specifications
Terex: mobile-crane references
- Terex AC100 to AC140 specifications
- Terex AC25 to ATT400-3 specifications
- Terex AC250-1, AC300/6, and AC350 specifications
- Terex AC40/2 to AC60/3L specifications
- Terex AC500-2 and AC700 specifications
- Terex AC55L specifications
- Terex CD200 to RT600 specifications
Link-Belt: mobile-crane references
- Link-Belt HSP-8030 to RTC8050 specifications
- Link-Belt RTC-80110 SERIES II to RTC8060 specifications
- Link-Belt RTC8050 Series II to RTC8075 specifications
- Link-Belt HSP-8010 to HSP-8060 specifications
- Link-Belt 75 RT to RTC8090 Series II specifications
- Link-Belt RTC80100 and RTC80100 Series II specifications
Kato: mobile-crane references
- Kato 4100 and KA900 specifications
- Kato NK500E-V to NK1200 specifications
- Kato CR250, NK250E-V, and NK300 specifications
- Kato NK1600 specifications
- Kato NK300E-V and NK400E-III specifications
Grove: mobile-crane references
- Grove AT9120 to GMK5180 specifications
- Grove GMK4100 to GMK5165-2 specifications
- Grove GMK3050, GMK4085B, and GMK6220 specifications
- Grove GMK5210 to GMK7550 specifications
- Grove GMK5100, GMK5135, and GMK5165 specifications
- Grove AT400 to AT755S specifications
- Grove GMK5180-1 to RT875BXL specifications
Tadano: mobile-crane references
- Tadano ATF 400G-6, ATF-650XL-2, and ATF65G-4 specifications
- Tadano ATF 100G-4, ATF 200G-5, and ATF90G-4 specifications
- Tadano ATF160G-5 and ATF220G-5 specifications
- Tadano AR250E to RTF40-3 specifications
- Tadano GR300XL-1 to TR300XL-4 specifications
- Tadano GR550XL to TR800XXL-4 specifications
Krupp: mobile-crane references
- Krupp 70GMT-AT to KMK5120 specifications
- Krupp KMK11000 specifications
- Krupp KMK3045 and KMK3050 specifications
- Krupp 100GMT specifications
- Krupp 350GMT specifications
Broderson: mobile-crane references
- Broderson IC40A specifications
- Broderson IC80-1G, IC80-2G, and IC80-3G specifications
- Broderson IC200-2F, IC200-3F, and IC250-3B specifications
- Broderson RT300-2B, RT300-2C, and RT300C specifications
- Broderson IC20G and IC25A specifications
- Broderson IC35D specifications